Electro Waves supplied the XR Multipurpose Studio with wash lights, which can be used to change the colour and atmosphere of the space, general and accent lights, and the light control system. The contract also included the preliminary programming of the light system, as well as training in the use of the control system.
In the mechanics contract, great cooperation with good partners benefited the customer through prices, quality and innovative solutions. The tendering material for mechanics was drawn up by Akukon Oy, Electro Waves handled the implementation design and implemented the systems of both studies in cooperation with JDR Rigging Oy and Espoon HT Teknocenter Oy.

In connection with the mechanics contract, equipment was delivered to the XR Show/Demo Studio and the XR Multipurpose Studio. The contract included chain hoists with control centres, beam clamps for suspending the chain hoists, cabling, a 4-point truss system and a cable management system with junction boxes for the trusses. Safety and the load-bearing capacity of the structures are of the utmost importance in a project of this nature, so the necessary structural calculations (Structural Report) for the suspension system were carried out through an independent external operator, ensuring that the performance figures and load-bearing capacity of the suspension structures were in accordance with the plans.


Lauri Wilén is an AV architect who is responsible for the design and procurement of presentation technology at Metropolia. He says about the mechanical solutions: “The most noteworthy technical solution is that the user is able to easily and seamlessly adjust the height of the trusses to the desired level according to need and use. This enables the installation of new equipment, supplies and lights in the future, when the need arises”. Wilén is also very satisfied with the cooperation with Electro Waves: “The project progressed from order to deployment in a very exemplary manner and well on schedule, even though the prevailing global situation caused minor delays from time to time. It is worth noting that the installation contract could be carried out in such a way that the user was also able to have activities in the facilities during the work, meaning that the work site operated really efficiently”.

Hannes Jesar comments on the projects from the perspective of a user of the facilities, saying that as a user himself, the primary thing he looks at is how the trusses and lights look aesthetically and how they fit into the rest of the space. “Under no circumstances should technology stand out as something separate or attract too much attention, but rather it should fit nicely in the space, like any other piece of furniture. This has been done successfully. In addition, the trusses have added a finishing touch to our facilities.”
All in all, the cooperation in this project has worked very well. Electro Waves’ professionalism and expertise have enabled the functionalities of Metropolia’s augmented reality centre, innovative even by international standards, in terms of lighting and mechanical solutions.
Lauri Wilén would like to convey a special thanks to Electro Waves for the truly smooth communication during the entire process, as well as for their user-friendly approach.